Understanding the Swimming Pool Building Process from Start to Finish in FREEDOM REMODELING

Take a look at the step-by-step process of building swimming pools. You will be able to see the skill and craftsmanship of our pool builders as a bare piece of land becomes the pool of you and your family’s dreams.

The first step in the construction process will be meeting with one of our skilled designers to create a 3D rendering of your dream pool. Our goal is to design your family the perfect pool.

Once everything has been finalized, permits are issued, and your construction superintendent has met with you and your family, our excavator will strip the sod and prep the area for construction to begin.

After the sod is stripped and hauled away, the forms will be staked out in the shape of your swimming pool, to prepare for the hole to be dug & shaped.

When the forms are completed, the back hoe and dump truck arrive to dig the hole and to haul away the extra dirt if necessary. The hole is hand crafted by a skilled shaper using the back hoe.

After the digging and shaping is complete, the plumbing under the swimming pool is installed and the steel is bent and tied into place prior to installing the gunite.

When the steel inspection has been approved, the gunite is pneumatically applied to the steel and hand carved into shape. Don’t miss out on this process. The skill of these craftsmen are amazing!


After the gunite is completed, your project is beginning to look like your dream pool! Now we are ready for the rough grade.


The rough grade includes removing the forms and then the ground is graded. This prepares for the plumbing, tile, and deck to be installed.


Once the rough grade is completed, our plumber installs the remainder of the underground plumbing around the swimming pool and sets all of the swimming pool’s equipment.

Once the plumbing is completed, the waterline tile is installed around the perimeter of the swimming pool.


After the tile phase is completed, the deck & footers are formed. Then the cantilever forms are installed on the tile to shape the cantilevered edge on the deck.

After the deck inspection and form work are completed, the concrete will be laid out by one of our expert concrete finishers.

The finished concrete leaves a nice flat surface for our texture crew to apply the acrylic.

After the texture is complete, the entire deck gets a fresh coat of 100% acrylic deck paint with your choice of color.

Before the pool interior can be installed, the entire swimming pool is cleaned out and the step tile is installed. You’re getting closer to swim time!

Now the swimming pool interior is installed and the swimming pool is filled with water. One more step and it’s time to swim!

Once the pool is completely filled, our service technician starts up the pool equipment, cleans everything and balances the chemicals. Now it’s time to jump in and start enjoying life with an All Seasons Pool!

Contact

  • sun-fri: 8.00 am 6.00 pm

  • Bakersfield CA

  • 661-215-5656

  • freedomremodelingbuilders@gmail.com

Schedule a consultation